TiP Lab – almost there. working on details

The mobile lab is almost ready. maps have been laser-cut, the cover has been added and the drawers slide in and out thanks to two half-moon holes that allow us to pull them with ease

top-finishedinside-the-lab

team

our team: Maral, Shahrzad, and Faezeh checking the wax which will water proof our mobile installation

Taking a break. As the construction of the mobile lab is reaching its last phase, we start seeing some satisfied faces. Next step, deciding the details

 

 

 

20150601_175519